0*
@e
HISTORIC ST. AUGUSTINE PRESERVATION BOARD
May 4, 1973
John W. Griffin
Robert H. Steinbach
From:
Subject: Yaneda House Estimate of Restoration Costs
Below is listed .a cost breakdown for the restoration of the Juan Yaneda
(Montgomery B1SL7) House.
These figures do not include any needed research in either the architec-
tural or archaeological fields, since these are difficult areas in which
to estimate costs.
I have tried to write "In the necessary construction supervision as a part
of the project cost.
1 "Carpentry includess framing, mill work, roof, etc.) 11,000
2 Masonry (wall statil1zation, flert replastering, etc.) 9,800
3 P1umbing, n(ftq4,j kkfttc* 1,800
4 Heat a& 1,600
5 Insulatien'd waterpryvffng 1,000
6 Electrical 1,500
7 Landscaping 1 000
8) Miscellaneous, permits, fees. te.) 10% 2J40
*- *3o:1W
|