The undersigned, hereinafter call the bidder, having visited the site
of the proposed project, familiarized himself with the local conditions,
nature and extent of the work, the drawings, specifications a;nd contract
requirements, proposes to furnish the following for the restoration of
the Demesa-Sanchez House, St. George Street, St. Augustine, Florida,
State Project No. DOS-3200:
1%rinsh and install 1].1 air cfi,!. o+r1ti-I 0 ir.__' d^Ll jV l L i, c -J ti rt _,
pumps,! tanks and plumbing as detailed in Section 1, age-s 1-15 of the
specifications, and pages M-1 and M-2 of the Plans. (No concrete work,
cutting or patching artvi include _d)____
in full accordance with Instructions to Bidder, Contract and Contract
Documents relating thereto; and if awarded the contract, to complete
said work in 90 calendar days after receipt of "Notice to Proceed"
for the following Base Bid price:
Five 00/OQ,,
BASE BID Eleven Thousand Five Hundred Twenty Dollars l P 525.00
Alternate No. 1: Addition of No. 2 A/C unit (Add) $ 1,875.00
Acknowledgement is hereby made of receipt of the following addenda issued
during the bidding period:
Alternate No. 3: (Add) $ 214400
Addendum Number 1 dated ..
The bidder hereby agrees that (a) the above proposal shall remain in full
force and effect for a period of thirty (30) calendar days after the time
of the opening of his proposal and that the Bidder will not revoke or can-
cel this proposal or withdraw from the competition within the said thirty
(30) days; (b) in the event the contract is awarded to this Bidder, he
will enter into a formal written contract with the Owner in accordance with
the accepted bid, within ten (10) calendar days after said contract is sub-
mitted to him.
I 7
In Witness whereof, the Bidder has hereunto set his signature and
affixed. his seal this 14,th day of August, 99 .7
By: < I .
SVice-DPresik ent
Title: ,r Mechanical Division
SHuntley Brothers, Inc.
|