Group Title: Historic St. Augustine: De Mesa Sanchez House, Block 7 Lot 6
Title: [Letter to Hector Miron re De Mesa alarm/add phone line - Cerveau]
ALL VOLUMES CITATION MAP IT! PAGE IMAGE ZOOMABLE
Full Citation
STANDARD VIEW MARC VIEW
Permanent Link: http://ufdc.ufl.edu/UF00091263/00196
 Material Information
Title: Letter to Hector Miron re De Mesa alarm/add phone line - Cerveau
Series Title: Historic St. Augustine: De Mesa Sanchez House, Block 7 Lot 6
Physical Description: Correspondence
Language: English
Creator: Steinbach, Bob
Publication Date: 1987
 Subjects
Subject: Saint Augustine (Fla.)
43 Saint George Street (Saint Augustine, Fla.)
de Mesa-Sanchez House (Saint Augustine, Fla.)
Spatial Coverage: North America -- United States of America -- Florida -- Saint Johns -- Saint Augustine -- 43 Saint George Street
Coordinates: 29.896429 x -81.313225
 Record Information
Bibliographic ID: UF00091263
Volume ID: VID00196
Source Institution: University of Florida
Holding Location: University of Florida
Rights Management: All rights reserved by the source institution.
Resource Identifier: B7-L6

Full Text











HISTORIC ST. AUGUSTINE PRESERVATION BOARD


MEMORANDUM




TOs Hector Miron
FROM: Bob Steinbach
SUBJECT: De Mesa Alarm/Add Phone Line Cerveau
DATE: December 2, 1987


Village Key has quoted $525.00 to install 4 heat/smoke detectors
in the De Mesa House. Although not specified in the proposal,
Paul informed me that the price included the installation of an
auto-dialer to convert the system to a commercial monitoring
service.
This would free up the current phone line that is presently
dedicated to alarm only service and allow an additional line to
be installed in Cerveau without increasing our monthly basic
service, since the monitoring service does not require a
dedicated line.
In addition, a full service contact is available which includes
both the monitoring fee and all maintenance and repair. The cost
is $25.00/mo./system. I would recommend it. The monthly fee for
monitoring only is $15.00/system.
In order to proceed with this work, it will be necessary to have
a CSA issued for the installation of an additional line in
Cerveau and the removal of the dedicated line at De Mesa.
I have asked Village Key to submit a revised proposal specifying
exactly what they plan to do. As soon as we have that in hand,
and it is accepted, we can begin.




University of Florida Home Page
© 2004 - 2010 University of Florida George A. Smathers Libraries.
All rights reserved.

Acceptable Use, Copyright, and Disclaimer Statement
Last updated October 10, 2010 - - mvs