10: Governor Farril Bryant
mm: winm 1'. Mayo
81m: Interstate 95 planning as requested by you thin morning
it tho and 01 the Collins Abomination tho State had lot to. follow-
ing var): to contact on Interstate Route 95:
motion must!) Approx. Coat
Incl. R/I:
Miami Emswly (1-195) Julia. Tuttlo
Gamay 15.3 8 19,800,000
141ml Expreomy 29th St. to 135th St. 6.h h2,800,ooo
Jacksonville mpreuwoy, Atlantic Blvd. to
Edgc'aood Ave. 6.9 2, 200,000
Toma 17.6 $ 93,100,000
In addition, planning was underway At the and of tho Collins Administra-
tion which probably would have been folloved by any mending administra-
tion for the following project-.0 on Interstate 95, uhich thin Administration
in 001%:
location Length Approx .COSK.
on-n------------C.--------noonounuuunuqnn-unuuunu----------OQDQQOg_----
Completion of mm Expressway (1-95), 3am Rd.
to 29th 51... and 135th St. thrown Golden Glades
Interchange 6.9 $ 66,000,000
(Including $k0,000,000 Dodo County Bond Isaac.)
Golden Glades Interchange to 3:: 61+ 11.8 7,600,000
SR 80 at West Palm Beach to connection to
Tux-mils: 15.1; 1 0 000
Totals 3&4 $ 92,900,000
Iictnrandm cavernor Bryant -2- Interniste 9;
4/.9, u3
Beyond the listed projectz. nho 0, these were no plans for the reminder
of Interstate 7 in so far an ocean. programme of funk or scheniiin; of
work to be Since the pretest administration came into office in
Jamar 1961, the following new or 1-95 have been presumed and schedules
of eczual construction have been planned:
location length Approx .005:
Incl R/h
In Btemrd County v 83 515 at Malabar to
55 91.1 11.0 $ 5.550.000
In nremrd County an 520 at Cocoa to 23 A6 21.7 7,650,000
In aroma County SR 511 to SR 20 at Cocoa lituh 15650, 000
From Interstate 1+, at Daytona Beach, to
Jacksonville 39-1 35: 300:000
Jacksonville to Georgia Line 22.2 11, 000,000
SR 5b to Davie Boulevard at Ft. louderdole 1.2 2,800,000
Totals 159.5 67,150,000
The conclusion of this report is that this Administration has planned
to construction schedule 159.6 miles of Interstate 95 at an approximate
cost 01' $67,150,000. This Administration, by following the planning of
3h.l miles, which may be attributed to the Collins Administration, and
the additional 159.6 miles will have put into reality 193.7 miles at an
optroxinnte cost of $160,000, 000. Thus, leaving for completion from the
period beginning 1966 through 1972 oyproxinetely 12h nilee at an approxi-
mate cost of $100, 000,000.
:0 o
PAGE 1
-\ ---_ -o -r a,/ 1., -.1,5 -,0
PAGE 2
~26-::..El -612 tis tan prDjac Lt to. c, t:.::.'e -.:cre ac p ~ 2.5 for t:le r..d .1:.0 : :/ I:.-.-.r:.-.cu 9ir. 60 far na ocles pago.::;i;;ig of f.ad:. or .;casi -.. E 07 -.:d: -a >0 ade. Elace i.he pr:.. --r aa.,ird :.-.ra-,ton ce';:e itse arrie. 2:-:,-----7 .90~-, tae rol.lcrira 2745 of I-95 llave -c:-=an prope:a.ted erd :cim~ f..e-. of c.c as ccatriic tig;; han acer, pi-;mad ; -meatier. Legth App-:ox-ect-. Incl. :t i: 3-c-:en loa:Ity -S i ylie at M~ziter to Cal 11.0 $ -, 50,000 Ir. Brave.re cottat.y -CR 520 at cocoa to ra 46 21.7 7,00,000 In E-:evard ''ounty -SR 5].1 to 5:1 20 at Cocoa lk.4 4,6-yo, Coe Frca 3-.cs-ate e at Day.ona Bee.eks to Jatom-ille '9-135,300,000 JE.ekronville to Georgia Lim 22-2 11,000, 000 CR S -3 Ds::le Bolevard e.t 20. J.asierdale 1.2 2,600,000 To-co.'s ly).6 5 6(,150,000 The ee:ac1Jdu.a of this re-_acrt in that tale .:..~=tnistration Ems p',a:u-.si o cc.2:i.r-.ict-a-1 scl-ehle 1593 r:llec of 1:arcate 9-6.0 a-1 appre-cs:-la.te ec:t :s 27,2i0,000. i'his ;/---1:121.ration, by fol'.ol:1::a the pia.anir.ci 3 .11:Ues, which may l'e atrrinted te the callias A211ir.i.Etra-.iori, t..ad e ac-Citicagi -.592 mi-les vill glage psi-. iatto reality 1933 railes asta --rs;imte cost of 5100, 003, 030. E'iu=, leadzfor corale-io:1 from the -Jeriw~ ~oer:ir-aine; 1906 thrag;h 1972 approxicately 126 milen at e.n spgroxi. te cost of 4100,000,000, .:31:0
|